Franklin High School

This $113 million renovation project consists of 287,000 square feet, with approximately 144,000 square feet of new construction, including the addition of the new performing arts center.  The 500-seat theater has an orchestra pit and full fly loft, and is supported by a separate black box theater for smaller productions… Read More

Roosevelt High School

Built in 1921, brick masonry schools sits on a 17-acre campus. The auditorium was part of an extensive addition in the 1930s.   Included as part of the 2017 bond, this $92 million renovation includes a new performing arts complex that features a state of the art 500-seat theater, black box… Read More

Grant High School

The $138M modernization of Grant High School included creating a new home for the local performing arts scene for both community driven performances and school events.  Grant’s historic auditorium was lacking in stage height, depth, proscenium width, technical support, lighting, and suffered from poor acoustics. Recognizable as the set from… Read More

McDaniel (Madison) High School

Leodis V. McDaniel High School (formerly Madison) is one of 3 PPS high schools modernized through the successful May 2017 Bond. Master planning for Leodis V. McDaniel High School was completed in June 2016 using funds from the 2012 Bond.  Construction was completed in the summer of 2021.  The rebuilding… Read More

STAGECRAFT INDUSTRIES INC

503-286-1600

5051 N Lagoon Ave
Portland, OR 97217

206-763-8800

5503 6th Ave South
Seattle, WA 98108